Universal Access To All Knowledge
Home Donate | Store | Blog | FAQ | Jobs | Volunteer Positions | Contact | Bios | Forums | Projects | Terms, Privacy, & Copyright
Search: Advanced Search
Anonymous User (login or join us)
Upload
Search Results
Results: 1 through 3 of 3 (0.003 secs)
You searched for: mediatype:texts AND collection:PresidioTrustLibrary AND subject:"Building 208"
[texts]Data Gaps Investigation Report Building 207/231 Area, Presidio of San Francisco, California - MACTEC Engineering and Consulting, Inc.
Investigation activities were performed to address data gaps identified from review of chemical, hydrogeologic, and historical data collected during previous investigations. Previous investigation results indicated that soil and shallow groundwater in specific areas had been affected with petroleum hydrocarbons and other related chemicals. These data gaps needed to be addressed to further characterize the nature and extent of soil and groundwater contamination at the Site and provide additional ...
Keywords: environmental remediation; Building 207/231 area; Building 38; Building 207; Building 208; Building 228; Building 230; Building 231; Building 271; Presidio Fuel Oil Distribution Pipeline; soil contamination; groundwater contamination; petroleum contamination
Downloads: 174
[texts]Final Corrective Action Implementation Work Plan and Construction Documents, Building 207/231 Area, Presidio of San Francisco, California, Volume II - MACTEC Engineering and Consulting, Inc.
A Corrective Action Implemenation Work Plan to implement corrective actions at five remedial units in the Building 207/231 Area, which comprises approximately 8 acres of land in the northeast portion of the Presidio located south of the Crissy Mars. Doyle Drive/Highway 101 north- and south-bound overpassess bisect the site. The purpose of the corrective actions are to achieve âclean closureâ for unrestricted reuse of the Site...
Keywords: environmental remediation; Building 207/231 Area; Building 207; Building 208; Building 38; Building 38-A; Building 231; Building 271; Building 230; Fuel Distribution System; soil contamination; groundwater contamination; petroleum contamination; corrective action plan
Downloads: 348
[texts]Final Corrective Action Implementation Work Plan Building 207/231 Area, Presidio of San Francisco, California - MACTEC Engineering and Consulting, Inc.
A Corrective Action Implemenation Work Plan to implement corrective actions at five remedial units in the Building 207/231 Area, which comprises approximately 8 acres of land in the northeast portion of the Presidio located south of the Crissy Mars. Doyle Drive/Highway 101 north- and south-bound overpassess bisect the site. The purpose of the corrective actions are to achieve âclean closureâ for unrestricted reuse of the Site...
Keywords: environmental remediation; Building 207/231 Area; Building 207; Building 208; Building 38; Building 38-A; Building 231; Building 271; Building 230; Fuel Distribution System; soil contamination; groundwater contamination; petroleum contamination; corrective action plan
Downloads: 160
Advanced search

Group results by:

> Relevance
Mediatype
Collection

Related mediatypes

texts

Terms of Use (10 Mar 2001)